Australian ILS Industry Support

Australia has a number of well qualified companies able to provide assistance to Manufacturers and Suppliers who have contracted to supply equipment to the Australian Defence Organisation (ADO)- Army, Navy, Air Force.
The support data and documentation required with the supplies is often under-estimated, and many Manufacturers and Suppliers of commercial equipment lack the experienced personnel to create the data or documentation in the appropriate format, which is where local contractors or consultants have their place.

Australian ILS Industry Support companies available to assist suppliers with :

Defence contract Integrated Logistics Support Deliverables:

Logistic Engineering Services

 

 

  • Engineering Analysis for Maintenance Requirements
  • Maintenance Engineering Analysis (MEA) / Maintenance Requirements Determination (MRD) for new and existing capital equipment;
  • Failure Modes Effects Analysis (FMEA);
  • Failure Modes, Effects and Criticality Analysis (FMECA);
  • Reliability Centred Maintenance (RCM);
  • Life Cycle Cost Analysis (LCCA); and
  • Investigation and validation of Engineering Change Proposals.
  • Supply Support
  • Sparing Analysis inclusive of Recommended Provisioning Lists (RPL) / Manufacturers Recommended Parts Lists (MRSL);
  • Codification Data (CDATA) Packs;
  • Complete Equipment Schedule Lists (CESL);
  • Training Equipment Management List (TEML);
  • Australian Defence Aviation Authorised Spares Sets (ADAASS);  and
  • Packaging, Handling, Storage and Transportation (PHS&T).
  • Technical Authoring
  • Development of management plans;
  • Repair and Maintenance manuals and illustrated parts manuals;
  • Development of Australian Defence specific documentation and manuals such as:
  • Electrical and Mechanical Engineering Instructions (EMEIs);
  • User Handbooks (UHBs);
  • Australian Book of Reference (ABR), and Australian Air Publications (AAP);
  • Parts, system and repair manuals; and
  • Repair Parts Identification Lists (RPILs) and associated Repair Parts Scales (RPSs);
  • Company Operating Procedures and Standing Instructions; and
  • Investigation of maintenance and repair requirements and to document the maintenance requirements of an item or equipment throughout its service life.
  • Training Development and Delivery
  • Conduct of Training Needs Analysis;
  • Development of Training Recommendation Reports;
  • Development of Training Management Plans;
  • Development of Training Materials; and
  • Delivery of Training courses.
  • Tendering and Bid Support
  • Review and enhance tender submissions.
  • Develop and author management, quality and the range of ILS plans /sub-program plans as part of major tender submissions for prime Defence contractors and Small to Medium Enterprises (SME) and commercial industry tendering to government projects; and
  • Review and provide advice on tender structure and content for Defence and commercial industry;
  • Project Support Services
  • Develop or Review ILS plans and reports;
  • Maintenance Program Optimisation;
  • Configuration Management;
  • Database Administration; and
  • Independent Audits.

LES capabilities and Experience

Australian ILS Industry Support companies available to assist suppliers with:

Defence contract Integrated Logistics Support Training

Logistic Engineering Services – ILS Training

 

Australian ILS Industry Support companies available to assist suppliers with:

Defence contract Maintenance Requirements Determination (MRD) software :

Logistic Engineering Services eMRD

 

Australian ILS Industry Support companies available to assist suppliers with

Defence contract LSAR comparison software :

Logistic Engineering Services eMRDCompanion

 

Australian ILS Industry Support companies available to assist suppliers with

Defence contract Logistic Support Analysis Records (LSAR) software:

Logistic Engineering Services eLSA

 

Australian ILS Industry Support companies available to assist suppliers with

Defence contract Level of Repair Analysis (LORA) software:

Logistic Engineering Services eLORA

ILS Software Users and Projects

Australian ILS Industry Support companies available to assist suppliers with

Defence contract Australian Local Content:

Logistic Engineering Services

Defence contract Project Management Support

Luminact

Sep 012016
 

Maintenance Engineering Analysis (MEA).

FMEA, RCM, and MTA are also referred to as Maintenance Engineering Analysis (MEA).

  • FMEA  Failure Modes Effects Analysis – How can the equipment fail and what is the effect of failure.
  • RCM    Reliability Centred Maintenance – Maintenance focused on preventive replacements in order to maximise the operational period.
  • MTA    Maintenance Task Analysis – What specific tasks need to be performed to maintain the equipment
Sep 012016
 

Logistics Support Analysis

The six areas of LSA

Videos related to Logistic Support for the International Space Station (ISS)

loading
Big Buck Bunny
00:00
--
/
--
youtube play
vimeo play

Logistics Support

  • Logistic Support Analysis - NASA
    Logistic Support Analysis - NASA
  • Logistic Support Analysis - NASA - 2
    Logistic Support Analysis - NASA - 2

 

Logistics Support Analysis Software:  eLSA

Logistics Support Analysis Record Software: LSAR

Sep 012016
 

The purpose of a Logistic Support Analysis Record (LSAR) is to provide a consistent information source to support the conduct of Logistics Support Analysis (LSA) and related analyses, and enable the development and preparation ILS data products.
An LSAR applied effectively support analysis and achieves the fourth goal of LSA for both project and In- service use, to: “Develop and prepare attendant data products from a consistent information source.”
The purpose of this standard is to define the requirements for the application of a Logistic Support Analysis Record for and by the Organisation.
Detail record Requirements
LSA documentation, including LSAR data, is generated as a result of the analysis specified for the LSA Program. As such, the LSAR shall serve as the main Integrated Logistic Support (ILS) technical database applicable to all materiel acquisition programs to satisfy the support acquisition.

Annex A of DEF(AUST)5692 establishes the Logistic Support Analysis Record (LSAR) relational table titles and data content and format to be produced by an LSAR relational Automated Data Processing (ADP) system:

  •  It defines all the relational tables that comprise an LSAR database.
  •  In a relational database system, information is organised in the form of tables.
  •  Categories or columns of information are listed across the top of each table.
  •  Individual sets of information are listed as rows.
  •  LSAR relational tables are two-dimensional matrices of related data.
  •  Tables are defined in terms of columns (or data element definitions (DED)) and rows (or multiple sets of the columnar data elements).
  •  Information in this format can be easily visualised and understood.

DEF(AUST) 5692
Logistic Support Analysis (LSA) is a selected application of system engineering techniques, originally developed by the United States Department of Defence (US DOD) to provide effective and consistent analytical processes for identifying and implementing supportability requirements for the development and acquisition of major capital equipment. LSA, as applied in Defence expands LSA as a life Cycle Discipline to enable the benefits of consistent analytical techniques to be readily applied to major minor projects, modifications, In- service analysis for logistic optimisation, and disposal.
A key enabler to the success of the LSA Program, and the fourth goal of LSA, is to use a consistent data source for analysis to ensure an integrated solution between LSA, Integrated Logistic Support and related disciplines. The LSAR was developed to fulfil this requirement. Defence has added functionality to the LSAR developed by the US DoD and defined in MIL-STD- 1388-2B.
DEF(AUST)5692 provides the definition of data elements and structure of the LSAR to enable the collection, storage, retrieval and review of the LSAR data.
The DEF(AUST)5692 is structured as follows:
· Chapter 1: LSAR Program Requirements
· Chapter 2: LSAR General Requirements
· Chapter 3: Detailed requirements for the Preparation of an LSAR.
· Annex A. Contains the LSAR relational tables necessary for the development of a relational LSAR database.
· Annex B. Contains a description and the required format for each LSAR standard report.
· Annex C. Explains assignment of the key data elements: LSA Control Number (LCN), Alternate LCN Code (ALC), Usable On Code (UOC).
· Annex D. Contains guidance for tailoring of the LSAR Data.
· Annex E. Contains an LSAR Data Element Dictionary providing definitions for all data specified by Annex A.
Chapter 3, Annexes A,B and E establish requirements and can be included/referenced in contractual documents. Annexes C and D provide guidance for the implementation of LSAR data entry and program application of the LSAR. The main annexes for this course are Annex A and C.
LSA data is generated in all phases of the system/equipment life cycle and is used as input to follow-on analyses and as an aid in developing logistics products.

 

Logistic Support Analysis Record Software: LSAR

Logistics Support Analysis Software: eLSA

Background and History
US DOD realised a need to store results of Logistic Support Analysis (LSA) in a single database.
They developed standards to create LSARs that provided a standardised method for compiling and storing logistic and logistic related data for a program.
The Australian Defence Force (ADF) began looking at using LSARs in the early 1990s.
They actually had copies of a MIL‑STD‑1388‑2A product called DILSA.
Australian Dept of Defence began looking at using LSARs in the early ‘90s with the establishment of the CAPLOG (Capital Logistics) project.
The CAPLOG project got serious about using LSARs and associated software apps in an attempt to truly apply the principles of Integrated Logistic Support (ILS).
The centre of the CAPLOG ‘hub’ was a MIL‑STD‑1388‑2B based LSAR.
The project selected Omega2B as the corporate application.
As the project matured, it was recognised that MIL‑STD‑1388‑2B in its current form would not fulfil the intended needs of the ADF for two main reasons:

  •  Legacy data needed to continue to be managed for some time (ended up being almost 15 years).
  •  The ADF wanted to use the LSAR ‘through life’. This meant continuous management of maintenance documentation and the configuration of significant items (Maintenance Managed Items).

As a result, AAP 5102.003 was developed (AAP stands for Australian Air Publication)
The ADF called their databases Weapon System Databases (WSDBs) as opposed to LSARs to highlight the difference between MIL‑STD‑1388‑2B and AAP 5102.003
Over time certain deficiencies were identified with AAP 5102.003 and these were addressed with the development of DEF(AUST)5692 (including an overhaul of MIL‑STD‑1388‑1A to become DEF(AUST)5691).

S1000D

 
Weapon System Databases (WSDB)

Sep 012016
 

Facility and Asset Management

Facility, Asset and Fleet Management are very similar in many ways to Integrated Logistic Support (ILS).

They have the same sub functions as ILS:

  •  Reliability, Availability and Maintainability (RAM)
  •  Failure Modes, Effects & Criticality Analysis (FMECA) (done during design)
  •  Failure Modes & Effects Analysis (FMEA) (done after design to determine maintenance tasks)
  •  Reliability Centred Maintenance (RCM)
  •  Level Of Repair Analysis (LORA)
  •  Verification and Validation (V&V)
  •  Life Cycle Costing Analysis (LCCA)

Consider a ship or sub marine, which is essentially a building on / in a hull, it constitutes many common systems that require the same analysis and support that any facility or equipment might need:

Electrical

  • Electrical Generation systems
  • Electrical Distribution systems
  • Lighting systems
  • Emergency Lighting systems
  • Backup power systems / UPS / batteries

Electronic systems

  • Communication systems
  • Electronic Control systems
  • Information systems

Water

  • Water purification / desalination
  • Water storage / supply
  • Hot water production and storage
  • Water distribution / plumbing
  • Fire fighting system

Waste water

  • Grey water system / recyclable / alternate use
    • Distribution, treatment and storage
  • Black water system / Sewage
    • Distribution, treatment and storage

Power Plant / Engine

  • Engine mechanics
  • Fuel system
  • Intake air filtering system
  • Exhaust system
  • Lubrication system
  • Hydraulic system
  • Cooling system

Transmission

  • Gearbox
  • Drive shafts
  • Output drive (propeller)

Stowage

  • Tanks (fuel / water / supplies / cargo)
  • Storage compartments and shelving (supplies, cargo, support equipment)

Structure

  • Hull / frame
  • Walls
  • Flooring
  • Roof

Ancillary equipment

  • Support boats / inflatables
  • Lifting equipment
  • Winches
  • Weaponry

Ancillary Support equipment

  • Repair workshops
  • Food preparation, handling and cooking equipment.

Safety systems

  • Fire fighting system
  • Smoke / gas detection
  • Emergency escape systems –
    • slides / ladders / life boats
  • Life preserving systems
    • Life vests, Emergency Breathing apparatus, Defibrillators

The majority of the above also apply to aircraft and to many vehicle systems and of course to land based buildings.

Thus the same integrated logistic support techniques can be applied to non military equipment and facilities with the same benefits in terms of minimising down time and through life costs while maximising availability and performance.

Australian Asset Management

Asset Integrity

 

Aug 312016
 

Reliability, Availability, Maintainability (RAM)

RAM is the assessment of the inherent reliability of an item or system,

  • Reliability: how long it can be expected to operated before failure, based on the individual components from which it is comprised
  • Availability: its expected or required availability for operations, and
  • Maintainability: the maintenance time and complexity of repair of individual items,

which are then used to determine redundancy requirements, equipment quantity and maintenance resources required.

Videos related to Software Maintainability

loading
Big Buck Bunny
00:00
--
/
--
youtube play
vimeo play

Software Maintainability

  • Software Maintainability
    Software Maintainability
  • Making Software Maintainable
    Making Software Maintainable
Aug 312016
 

Failure Modes Effects Analysis
Failure Modes Effects Analysisis is the analysis of HOW the equipment can fail and what is the effect of failure.

It is designed to identify potential failure modes for an item or system, to assess the risks involved with those failures, to categorise and order in terms of importance, and to identify and either put in place mitigations or institute corrective actions to address those that can be addressed.

Aug 312016
 

Failure Modes Effects Criticality Analysis
Failure Modes Effects Criticality Analysis (FMECA) is the analysis of HOW the equipment can fail, what is the effect of failure and how critical is the failure.
It is designed to identify potential failure modes for an item or system, to assess the risks involved with those failures, to categorise and order in terms of importance, identify the criticality of the failure, and to identify and either put in place mitigations or institute corrective actions to address those that can be addressed.

Aug 312016
 

Level of Repair Analysis

What is Level Of Repair Analysis?

Level Of Repair Analysis combines two elements:

  •  Cost Analysis
  •  Repair Level Analysis

Cost Analysis determines Whether maintenance should be performed; which includes all costs incurred:

  • to establish and utilise a repair venue
  • the tooling required for the repair
  •  the skill of the repairer
  • in obtaining the Training required in order to perform the repair
  • in the Rates of pay of personnel conducting the repair
  • in the Cost of conducting the repair – i.e. time
  • in the Cost of the repair parts
  • in the Transport costs of getting the equipment to and from the repair base
  • in Other overheads

Repair Level Analysis (RLA) determines Where the maintenance should be performed; this in turn determines where the equipment can be repaired:

  • Operational/Organisational Level Maintenance •Light Grade Repair
  • Organic (On-board ship)
  • On the Flight Line

 

  • •Intermediate Level Maintenance •Medium Grade Repair – Mobile workshop
    •External (Along side dock )

 

  • •Deeper/Depot Level Maintenance •Heavy Grade Repair
    •Contractor (External )
    •Maintenance Depot

Level of Repair Analysis Software : eLORA